The first 100 days of integration
In our earlier article we looked at why integration problems stay hidden until they show in reporting. This one is about the first 100 days, when most of the outcome is settled.
Days 1 to 30: find out how the work really flows
The organization chart tells you who reports to whom. It does not tell you who actually works with whom. In the first month, build a picture of how each side really operates: which teams carry the key client relationships, which people hold otherwise separate groups together, and where the load is already heavy.
Days 31 to 60: protect what matters
- Critical client relationships. Find the ones that rest on a few individuals and widen them before anybody leaves.
- The people who connect the two sides. They are doing the integration whether or not anyone has given them the job. Give them the time and the authority to do it.
- Overloaded teams. Integration work concentrates. Relieve the pressure before it turns into resignations.
Days 61 to 100: check that it is actually happening
By now the combined teams should be working together. Watch for the signs that they are not: groups still operating as separate islands, decisions routing around the new structure, and client or partner relationships thinning on one side of the deal.
The part most integration plans skip
Integration plans tend to cover systems, reporting lines and cost. They rarely cover how the work will actually get done once the two sides are merged, which is where most of the value sits. That is where the value is won or lost, and the first 100 days is when it is cheapest to get right.
After 100 days
The first 100 days set the pattern. Keep watching the same signals and keep acting on them while changing course is still inexpensive.
If you have a deal closing, this is the period to get right.